{"id":1016,"date":"2020-07-13T09:28:51","date_gmt":"2020-07-13T09:28:51","guid":{"rendered":"http:\/\/scoremarketing.es\/maquetaferralia\/?page_id=1016"},"modified":"2021-05-10T09:37:11","modified_gmt":"2021-05-10T09:37:11","slug":"puente-gemelo-de-villena","status":"publish","type":"page","link":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/","title":{"rendered":"Villena Twin Bridge"},"content":{"rendered":"<section class=\"cabecera-interior fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"contenedor\">\r\n            <h1 class=\"after\">OUR <b>PROJECTS<\/b><\/h1>\r\n        <\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"intro-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"texto-izq\">\r\n            <h3 class=\"primero\"><b>Villena Twin Bridge<\/b>. Miraflores<\/h3>\r\n            <h3><b>Key data<\/b><\/h3>\r\n            <p class=\"grande\">The second Villena bridge was built parallel to the existing bridge and with a similar architecture to that of its predecessor.<\/p>\r\n            <p class=\"grande\">This new bridge increased into two traffic lands via roadway splitting between two of the busiest areas of Miraflores, has reduced traffic congestion by over 60% during peak traffic hours.<\/p>\r\n            <h3><b>System implemented<\/b><\/h3>\r\n            <p class=\"grande\">Comprehensive steel construction service; Supply, fitting out and installation of the steel already sized \u201cin situ\u201d, of the various structures which made up the work.<\/p>\r\n            <ul>\r\n                <li>The foundations of the bridge were laid directly on the ground, executed with two footings, one at each end of the bridge, each excavated to a 21 m depth.<\/li>\r\n                <li>The bridge structure is completed with two reinforced concrete arches, which are supported on the foundations. The arches are of variable depth with a box section upper deck.<\/li>\r\n                <li>The construction of the arches was carried out progressively on each side of the infrastructure, to that end, using travelling cranes, which enabled executing the central part of the deck under a progressive cantilever system.<\/li>\r\n                <li>Continuity connectors were used to connect the central segments of the rods.<\/li>\r\n            <\/ul>\r\n            <h3><b>Project type<\/b><\/h3>\r\n            <p class=\"grande\">Large-scale civil infrastructures<\/p>\r\n            <h3><b>Location<\/b><\/h3>\r\n            <p class=\"grande\">District of Miraflores, Lima-Peru<\/p>\r\n            <h3><b>Client<\/b><\/h3>\r\n            <p class=\"grande\">Consorcio Villena<\/p>\r\n            <ul>\r\n                <li>Corporaci\u00f3n Mayo S.A.C.<\/li>\r\n                <li>Constructora Duran SA.<\/li>\r\n                <li>Constructora y Promotora Balzola SA.<\/li>\r\n            <\/ul>\r\n            <h3><b>TN<\/b><\/h3>\r\n            <p class=\"grande\">650 ejecutadas<\/p>\r\n        <\/div>\r\n        <div class=\"galeria-der\">\r\n            <div class=\"contenedor\">\r\n                <img decoding=\"async\" src=\"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-puentegemelovillena.jpg\">\r\n                <!--galeria-proyectos-puentegemelovillena-1-->\r\n<div id='gallery-1' class='gallery galleryid-1016 gallery-columns-4 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-7.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"89\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"89\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-2.jpg 813w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-2-768x537.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-3.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-4.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-4.jpg 1723w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-4-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-4-1536x1075.jpg 1536w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"89\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-5.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-6.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"89\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-6.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-6.jpg 813w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-6-768x537.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\r\n            <\/div> \r\n        <\/div>\r\n        <div class=\"limpiar\"><\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <h2>related projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos recientes\">\r\n    <article class=\"cuerpo\">\r\n        <h2>recent projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>","protected":false},"excerpt":{"rendered":"OUR PROJECTS Villena Twin Bridge. Miraflores Key data The second Villena bridge was built parallel to the existing bridge and with a similar architecture to that of its predecessor. This new bridge increased into two traffic lands via roadway splitting between two of the busiest areas of Miraflores, has reduced traffic congestion by over 60% [&hellip;]","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1016","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Villena Twin Bridge - Ferralia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Villena Twin Bridge - Ferralia\" \/>\n<meta property=\"og:description\" content=\"OUR PROJECTS Villena Twin Bridge. Miraflores Key data The second Villena bridge was built parallel to the existing bridge and with a similar architecture to that of its predecessor. This new bridge increased into two traffic lands via roadway splitting between two of the busiest areas of Miraflores, has reduced traffic congestion by over 60% [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferralia\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-10T09:37:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-7.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/\",\"name\":\"Villena Twin Bridge - Ferralia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-puentegemelovillena.jpg\",\"datePublished\":\"2020-07-13T09:28:51+00:00\",\"dateModified\":\"2021-05-10T09:37:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-puentegemelovillena.jpg\",\"contentUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-puentegemelovillena.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/puente-gemelo-de-villena\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Villena Twin Bridge\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\",\"name\":\"Ferralia\",\"description\":\"Leading industrial operator in the comprehensive rebar service\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferralia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Villena Twin Bridge - Ferralia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/","og_locale":"en_GB","og_type":"article","og_title":"Villena Twin Bridge - Ferralia","og_description":"OUR PROJECTS Villena Twin Bridge. Miraflores Key data The second Villena bridge was built parallel to the existing bridge and with a similar architecture to that of its predecessor. This new bridge increased into two traffic lands via roadway splitting between two of the busiest areas of Miraflores, has reduced traffic congestion by over 60% [&hellip;]","og_url":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/","og_site_name":"Ferralia","article_modified_time":"2021-05-10T09:37:11+00:00","og_image":[{"url":"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-puentegemelovillena-7.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/","url":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/","name":"Villena Twin Bridge - Ferralia","isPartOf":{"@id":"https:\/\/ferralia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/#primaryimage"},"image":{"@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/#primaryimage"},"thumbnailUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-puentegemelovillena.jpg","datePublished":"2020-07-13T09:28:51+00:00","dateModified":"2021-05-10T09:37:11+00:00","breadcrumb":{"@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/#primaryimage","url":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-puentegemelovillena.jpg","contentUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-puentegemelovillena.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ferralia.com\/en\/puente-gemelo-de-villena\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferralia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Villena Twin Bridge"}]},{"@type":"WebSite","@id":"https:\/\/ferralia.com\/en\/#website","url":"https:\/\/ferralia.com\/en\/","name":"Ferralia","description":"Leading industrial operator in the comprehensive rebar service","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferralia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"_links":{"self":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/comments?post=1016"}],"version-history":[{"count":5,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1016\/revisions"}],"predecessor-version":[{"id":1710,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1016\/revisions\/1710"}],"wp:attachment":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/media?parent=1016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}