{"id":1075,"date":"2020-07-13T17:47:31","date_gmt":"2020-07-13T17:47:31","guid":{"rendered":"http:\/\/scoremarketing.es\/maquetaferralia\/?page_id=1075"},"modified":"2021-05-10T15:19:06","modified_gmt":"2021-05-10T15:19:06","slug":"linea-amarilla-de-lima","status":"publish","type":"page","link":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/","title":{"rendered":"Lima Yellow Line"},"content":{"rendered":"<section class=\"cabecera-interior fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"contenedor\">\r\n            <h1 class=\"after\">OUR <b>PROJECTS<\/b><\/h1>\r\n        <\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"intro-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"texto-izq\">\r\n            <h3 class=\"primero\"><b>Lima Yellow Line<\/b><\/h3>\r\n            <h3><b>Key data<\/b><\/h3>\r\n            <p class=\"grande\">This includes the construction of an urban dual carriageway, generally overhead, which will decongest traffic flows in the northern sector of Lima.<\/p>\r\n            <h3><b>System implemented<\/b><\/h3>\r\n            <p class=\"grande\">Comprehensive steel construction service: supply, fitting out and industrially reinforced steel reinforcement in piles.<\/p>\r\n            <ul>\r\n                <li>The expressway borders the Rimac River and is built on insubstantial shallow alluvial soils. For this reason, a deep foundation -piles- was constructed to provide consistency and support for the loads that the foundations would withstand.<\/li>\r\n                <li>Due to the awkward and narrow situation of the frontage, with insufficient space to work \u201cin situ\u201d, all the piles had to be assembled in the workshop, supplying these to the site in the lengths requested by the construction companies. For this purpose, \u201cpiles assembled in a single section\u201d of up to twenty-six metres in length (26 metres) were sent to the site, using extendable and articulated trucks for their transport.<\/li>\r\n            <\/ul>\r\n            <h3><b>Project type<\/b><\/h3>\r\n            <p class=\"grande\">Large-scale civil infrastructures<\/p>\r\n            <h3><b>Location<\/b><\/h3>\r\n            <p class=\"grande\">Department of Lima; North of Cercado de Lima, Bordering the Rimac River.<\/p>\r\n            <h3><b>Client<\/b><\/h3>\r\n            <ul>\r\n                <li>Gra\u00f1a y Montero, S.A.<\/li>\r\n                <li>Soletanche Vachy, S.A.<\/li>\r\n                <li>Mota-Engil, S.A.<\/li>\r\n                <li>Incotec Per\u00fa, S.A.<\/li>\r\n            <\/ul>\r\n            <h3><b>TN<\/b><\/h3>\r\n            <p class=\"grande\">3.800 executed in various structures<\/p>\r\n        <\/div>\r\n        <div class=\"galeria-der\">\r\n            <div class=\"contenedor\">\r\n                <img decoding=\"async\" src=\"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-amarillalima.jpg\">\r\n                <!--galeria-proyectos-amarillalima-1-->\r\n<div id='gallery-1' class='gallery galleryid-1075 gallery-columns-4 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-8.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-8.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-1-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-2.jpg 1028w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-2-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-3-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-4-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-5-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-6.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-6.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-6.jpg 814w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-6-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-7.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-7.jpg 772w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-7-768x537.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\r\n            <\/div> \r\n        <\/div>\r\n        <div class=\"limpiar\"><\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <h2>related projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos recientes\">\r\n    <article class=\"cuerpo\">\r\n        <h2>recent projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>","protected":false},"excerpt":{"rendered":"OUR PROJECTS Lima Yellow Line Key data This includes the construction of an urban dual carriageway, generally overhead, which will decongest traffic flows in the northern sector of Lima. System implemented Comprehensive steel construction service: supply, fitting out and industrially reinforced steel reinforcement in piles. The expressway borders the Rimac River and is built on [&hellip;]","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1075","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lima Yellow Line - Ferralia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lima Yellow Line - Ferralia\" \/>\n<meta property=\"og:description\" content=\"OUR PROJECTS Lima Yellow Line Key data This includes the construction of an urban dual carriageway, generally overhead, which will decongest traffic flows in the northern sector of Lima. System implemented Comprehensive steel construction service: supply, fitting out and industrially reinforced steel reinforcement in piles. The expressway borders the Rimac River and is built on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferralia\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-10T15:19:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-8.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/\",\"name\":\"Lima Yellow Line - Ferralia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-amarillalima.jpg\",\"datePublished\":\"2020-07-13T17:47:31+00:00\",\"dateModified\":\"2021-05-10T15:19:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-amarillalima.jpg\",\"contentUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-amarillalima.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/linea-amarilla-de-lima\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lima Yellow Line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\",\"name\":\"Ferralia\",\"description\":\"Leading industrial operator in the comprehensive rebar service\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferralia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lima Yellow Line - Ferralia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/","og_locale":"en_GB","og_type":"article","og_title":"Lima Yellow Line - Ferralia","og_description":"OUR PROJECTS Lima Yellow Line Key data This includes the construction of an urban dual carriageway, generally overhead, which will decongest traffic flows in the northern sector of Lima. System implemented Comprehensive steel construction service: supply, fitting out and industrially reinforced steel reinforcement in piles. The expressway borders the Rimac River and is built on [&hellip;]","og_url":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/","og_site_name":"Ferralia","article_modified_time":"2021-05-10T15:19:06+00:00","og_image":[{"url":"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-amarillalima-8.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/","url":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/","name":"Lima Yellow Line - Ferralia","isPartOf":{"@id":"https:\/\/ferralia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/#primaryimage"},"image":{"@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/#primaryimage"},"thumbnailUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-amarillalima.jpg","datePublished":"2020-07-13T17:47:31+00:00","dateModified":"2021-05-10T15:19:06+00:00","breadcrumb":{"@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/#primaryimage","url":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-amarillalima.jpg","contentUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-amarillalima.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ferralia.com\/en\/linea-amarilla-de-lima\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferralia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Lima Yellow Line"}]},{"@type":"WebSite","@id":"https:\/\/ferralia.com\/en\/#website","url":"https:\/\/ferralia.com\/en\/","name":"Ferralia","description":"Leading industrial operator in the comprehensive rebar service","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferralia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"_links":{"self":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1075","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/comments?post=1075"}],"version-history":[{"count":4,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1075\/revisions"}],"predecessor-version":[{"id":1737,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/1075\/revisions\/1737"}],"wp:attachment":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/media?parent=1075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}