{"id":942,"date":"2020-07-10T09:51:59","date_gmt":"2020-07-10T09:51:59","guid":{"rendered":"http:\/\/scoremarketing.es\/maquetaferralia\/?page_id=942"},"modified":"2021-05-10T14:41:54","modified_gmt":"2021-05-10T14:41:54","slug":"remodelacion-estadio-santiago-bernabeu","status":"publish","type":"page","link":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/","title":{"rendered":"Santiago Bernab\u00e9u Stadium"},"content":{"rendered":"<section class=\"cabecera-interior fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"contenedor\">\r\n            <h1 class=\"after\">OUR <b>PROJECTS<\/b><\/h1>\r\n        <\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"intro-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"texto-izq\">\r\n            <h3 class=\"primero\"><b>Santiago Bernab\u00e9u Stadium Remodelling<\/b><\/h3>\r\n            <h3><b>Key data<\/b><\/h3>\r\n            <p class=\"grande\">The remodelling of the Santiago Bernab\u00e9u Stadium to become one of the most modern stadiums in the world.<\/p>\r\n            <p class=\"grande\">To this end, a structural alternative is proposed to guarantee the use of the stadium during the execution of the works, drastically reducing the interventions on the pitch and stands and separating the construction of the stadium roof from the works on the new buildings. The proposed structural alternative uses as basic elements two east-west and four north-south fastened trusses which transfer their vertical loads to four new construction elements. In the west, to two new evacuation towers, and in the east, to two pillars located in the existing towers.<\/p>\r\n            <p class=\"grande\">In the first season, the dismantling of the north and south roofs commenced. The west towers, the multi-purpose building and stands and east fa\u00e7ade would be demolished during the second summer. The east and west roofs dismantled and the trusses raised. In the second season, the east beam will be dismantled and the transverse trusses and the new roof on the eastern side of the stadium will be erected. The third summer will be used to assemble the east roof, the museum beam and the fa\u00e7ade structure.<\/p>\r\n            <h3><b>Project type<\/b><\/h3>\r\n            <p class=\"grande\">Large-scale infrastructures \u2013 Sports facilities<\/p>\r\n            <h3><b>Location<\/b><\/h3>\r\n            <p class=\"grande\">Madrid \u2013 Spain<\/p>\r\n            <h3><b>Client<\/b><\/h3>\r\n            <p class=\"grande\">FCC<\/p>\r\n            <h3><b>TN<\/b><\/h3>\r\n            <p class=\"grande\">3.000 Tonnes \u2013 Stage 1 \u2013 Foundation \u2013 Piles<\/p>\r\n        <\/div>\r\n        <div class=\"galeria-der\">\r\n            <div class=\"contenedor\">\r\n                <img decoding=\"async\" src=\"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-estadiobernabeu.jpg\">\r\n                <!--galeria-proyectos-estadiobernabeu-1-->\r\n<div id='gallery-1' class='gallery galleryid-942 gallery-columns-4 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9.jpg 1024w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9-768x537.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-10.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-10.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-10.jpg 1022w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-10-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-11.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-11.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-11.jpg 1022w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-11-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-1.jpg 1280w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-1-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-2.jpg 822w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-2-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-3-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-4.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-4.jpg 2046w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-4-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-4-1536x1076.jpg 1536w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-5.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-5.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-5.jpg 1462w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-5-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-6.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-6.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-6.jpg 1080w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-6-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-7.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-7.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-7.jpg 1462w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-7-768x538.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-8.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-8.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-8.jpg 968w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-8-768x537.jpg 768w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\r\n            <\/div> \r\n        <\/div>\r\n        <div class=\"limpiar\"><\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <h2>related projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos recientes\">\r\n    <article class=\"cuerpo\">\r\n        <h2>recent projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>","protected":false},"excerpt":{"rendered":"OUR PROJECTS Santiago Bernab\u00e9u Stadium Remodelling Key data The remodelling of the Santiago Bernab\u00e9u Stadium to become one of the most modern stadiums in the world. To this end, a structural alternative is proposed to guarantee the use of the stadium during the execution of the works, drastically reducing the interventions on the pitch and [&hellip;]","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-942","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Santiago Bernab\u00e9u Stadium - Ferralia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Santiago Bernab\u00e9u Stadium - Ferralia\" \/>\n<meta property=\"og:description\" content=\"OUR PROJECTS Santiago Bernab\u00e9u Stadium Remodelling Key data The remodelling of the Santiago Bernab\u00e9u Stadium to become one of the most modern stadiums in the world. To this end, a structural alternative is proposed to guarantee the use of the stadium during the execution of the works, drastically reducing the interventions on the pitch and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferralia\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-10T14:41:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/\",\"name\":\"Santiago Bernab\u00e9u Stadium - Ferralia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-estadiobernabeu.jpg\",\"datePublished\":\"2020-07-10T09:51:59+00:00\",\"dateModified\":\"2021-05-10T14:41:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-estadiobernabeu.jpg\",\"contentUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-estadiobernabeu.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/remodelacion-estadio-santiago-bernabeu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Santiago Bernab\u00e9u Stadium\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\",\"name\":\"Ferralia\",\"description\":\"Leading industrial operator in the comprehensive rebar service\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferralia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Santiago Bernab\u00e9u Stadium - Ferralia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/","og_locale":"en_GB","og_type":"article","og_title":"Santiago Bernab\u00e9u Stadium - Ferralia","og_description":"OUR PROJECTS Santiago Bernab\u00e9u Stadium Remodelling Key data The remodelling of the Santiago Bernab\u00e9u Stadium to become one of the most modern stadiums in the world. To this end, a structural alternative is proposed to guarantee the use of the stadium during the execution of the works, drastically reducing the interventions on the pitch and [&hellip;]","og_url":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/","og_site_name":"Ferralia","article_modified_time":"2021-05-10T14:41:54+00:00","og_image":[{"url":"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-estadiobernabeu-9.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/","url":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/","name":"Santiago Bernab\u00e9u Stadium - Ferralia","isPartOf":{"@id":"https:\/\/ferralia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/#primaryimage"},"image":{"@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/#primaryimage"},"thumbnailUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-estadiobernabeu.jpg","datePublished":"2020-07-10T09:51:59+00:00","dateModified":"2021-05-10T14:41:54+00:00","breadcrumb":{"@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/#primaryimage","url":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-estadiobernabeu.jpg","contentUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-estadiobernabeu.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ferralia.com\/en\/remodelacion-estadio-santiago-bernabeu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferralia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Santiago Bernab\u00e9u Stadium"}]},{"@type":"WebSite","@id":"https:\/\/ferralia.com\/en\/#website","url":"https:\/\/ferralia.com\/en\/","name":"Ferralia","description":"Leading industrial operator in the comprehensive rebar service","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferralia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"_links":{"self":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/comments?post=942"}],"version-history":[{"count":5,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/942\/revisions"}],"predecessor-version":[{"id":1717,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/942\/revisions\/1717"}],"wp:attachment":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/media?parent=942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}