{"id":980,"date":"2020-07-13T08:42:58","date_gmt":"2020-07-13T08:42:58","guid":{"rendered":"http:\/\/scoremarketing.es\/maquetaferralia\/?page_id=980"},"modified":"2021-05-10T08:22:16","modified_gmt":"2021-05-10T08:22:16","slug":"pozos-de-ventilacion-linea-2-del-metro-de-lima","status":"publish","type":"page","link":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/","title":{"rendered":"Ventilation shafts \u2013 Lima Metro Line 2"},"content":{"rendered":"<section class=\"cabecera-interior fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"contenedor\">\r\n            <h1 class=\"after\">OUR <b>PROJECTS<\/b><\/h1>\r\n        <\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"intro-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <div class=\"texto-izq\">\r\n            <h3 class=\"primero\"><b>Ventilation shafts \u2013 Lima Metro Line 2<\/b><\/h3>\r\n            <h3><b>Key data<\/b><\/h3>\r\n            <p class=\"grande\">This includes the construction of circular and successive rings, one under each other, to support the ground, containment and excavation, until reaching the tunnel clearance level.<\/p>\r\n            <h3><b>System implemented<\/b><\/h3>\r\n            <p class=\"grande\">Comprehensive steel service for construction; Supply, industrial fitting out of reinforcement steel, and installation of the steel already sized \u201cin situ\u201d, of the various structures which made up the work, after prior excavation of the circular area, and preparation of the formwork against the ground, the reinforcement is executed in the form of a ring around the perimeter of the excavated area. Once the first ring has been executed and anchored against the ground, the area corresponding to the next ring is excavated underneath same, and this process is carried out for all the successive rings.<\/p>\r\n            <p class=\"grande\">The work consists of the excavation of vertical shafts for ventilation, (generally approximately 17 metres of excavation diameter, and between 20 and 30 metres deep, in rings of approximately two metres in height).<\/p>\r\n            <h3><b>Project type<\/b><\/h3>\r\n            <p class=\"grande\">Large-scale civil infrastructures<\/p>\r\n            <h3><b>Location<\/b><\/h3>\r\n            <p class=\"grande\">Department of Lima; Route from the District Municipality of Ate to the District Municipality of Callao.<\/p>\r\n            <h3><b>Client<\/b><\/h3>\r\n            <p class=\"grande\">Empresa Portuguesa de Obras Subterraneas.<\/p>\r\n            <p class=\"grande\">Obras Subterraneas, S.A.<\/p>\r\n            <p class=\"grande\">Consorcio La Colectora, (Geot\u00fanel, S.L., Construcciones y Promociones Balzola Sucursal del Peru) (Consortium).<\/p>\r\n            <h3><b>TN<\/b><\/h3>\r\n            <p class=\"grande\">2.400 executed in several wells<\/p>\r\n        <\/div>\r\n        <div class=\"galeria-der\">\r\n            <div class=\"contenedor\">\r\n                <img decoding=\"async\" src=\"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-pozosdeventilacionlineados.jpg\">\r\n                <!--galeria-proyectos-pozosdeventilacionlineados-1-->\r\n<div id='gallery-1' class='gallery galleryid-980 gallery-columns-4 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-3.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-3.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-4-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-1-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"90\" src=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" srcset=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2.jpg 2560w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2-768x538.jpg 768w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2-1536x1075.jpg 1536w, https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-2-2048x1434.jpg 2048w\" sizes=\"auto, (max-width: 128px) 100vw, 128px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\r\n            <\/div> \r\n        <\/div>\r\n        <div class=\"limpiar\"><\/div>\r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos\">\r\n    <article class=\"cuerpo\">\r\n        <h2>related projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>\r\n<section class=\"proyectos-carrousel-fichaproyectos recientes\">\r\n    <article class=\"cuerpo\">\r\n        <h2>recent projects<\/h2>\r\n        \r\n    <\/article>\r\n<\/section>","protected":false},"excerpt":{"rendered":"OUR PROJECTS Ventilation shafts \u2013 Lima Metro Line 2 Key data This includes the construction of circular and successive rings, one under each other, to support the ground, containment and excavation, until reaching the tunnel clearance level. System implemented Comprehensive steel service for construction; Supply, industrial fitting out of reinforcement steel, and installation of the [&hellip;]","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-980","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia\" \/>\n<meta property=\"og:description\" content=\"OUR PROJECTS Ventilation shafts \u2013 Lima Metro Line 2 Key data This includes the construction of circular and successive rings, one under each other, to support the ground, containment and excavation, until reaching the tunnel clearance level. System implemented Comprehensive steel service for construction; Supply, industrial fitting out of reinforcement steel, and installation of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferralia\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-10T08:22:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-3.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/\",\"name\":\"Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-pozosdeventilacionlineados.jpg\",\"datePublished\":\"2020-07-13T08:42:58+00:00\",\"dateModified\":\"2021-05-10T08:22:16+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-pozosdeventilacionlineados.jpg\",\"contentUrl\":\"https:\\\/\\\/ferralia.com\\\/wp-content\\\/uploads\\\/intro-fichaproyectos-pozosdeventilacionlineados.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/pozos-de-ventilacion-linea-2-del-metro-de-lima\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ventilation shafts \u2013 Lima Metro Line 2\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ferralia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ferralia.com\\\/en\\\/\",\"name\":\"Ferralia\",\"description\":\"Leading industrial operator in the comprehensive rebar service\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ferralia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/","og_locale":"en_GB","og_type":"article","og_title":"Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia","og_description":"OUR PROJECTS Ventilation shafts \u2013 Lima Metro Line 2 Key data This includes the construction of circular and successive rings, one under each other, to support the ground, containment and excavation, until reaching the tunnel clearance level. System implemented Comprehensive steel service for construction; Supply, industrial fitting out of reinforcement steel, and installation of the [&hellip;]","og_url":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/","og_site_name":"Ferralia","article_modified_time":"2021-05-10T08:22:16+00:00","og_image":[{"url":"https:\/\/ferralia.com\/en\/wp-content\/uploads\/galeria-proyectos-pozosdeventilacionlineados-3.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/","url":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/","name":"Ventilation shafts \u2013 Lima Metro Line 2 - Ferralia","isPartOf":{"@id":"https:\/\/ferralia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/#primaryimage"},"image":{"@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/#primaryimage"},"thumbnailUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-pozosdeventilacionlineados.jpg","datePublished":"2020-07-13T08:42:58+00:00","dateModified":"2021-05-10T08:22:16+00:00","breadcrumb":{"@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/#primaryimage","url":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-pozosdeventilacionlineados.jpg","contentUrl":"https:\/\/ferralia.com\/wp-content\/uploads\/intro-fichaproyectos-pozosdeventilacionlineados.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ferralia.com\/en\/pozos-de-ventilacion-linea-2-del-metro-de-lima\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ferralia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Ventilation shafts \u2013 Lima Metro Line 2"}]},{"@type":"WebSite","@id":"https:\/\/ferralia.com\/en\/#website","url":"https:\/\/ferralia.com\/en\/","name":"Ferralia","description":"Leading industrial operator in the comprehensive rebar service","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ferralia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"}]}},"_links":{"self":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/comments?post=980"}],"version-history":[{"count":6,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/980\/revisions"}],"predecessor-version":[{"id":1689,"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/pages\/980\/revisions\/1689"}],"wp:attachment":[{"href":"https:\/\/ferralia.com\/en\/wp-json\/wp\/v2\/media?parent=980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}