Key data
Seventy-five thousand (75.000) m2 constructed surface area, the largest museum in Peru and fifth largest in the world.
System implemented
Comprehensive steel construction service: supply, fitting out and industrially reinforced steel reinforcement, and installation of the steel already fitted and/or reinforced “in situ”, of the various structures which made up the work. The execution of the work entailed a workload in which the production rates exceeded 2,500 tonnes per month of reinforced and installed steel, applying a factory industrial pre-assembly system which exceeded 5,000 tonnes of steel and the installation of over 22,000 mechanical connectors.
Project type
Large-scale infrastructures-Special construction.
Location
Lima-Peru
Client
Consorcio MUNA (Consortium)
TN
14.000